Companies are facing increasingly stricter environmental laws, so St-Lawrence Stevedoring asked Deric Construction to design and build a basin to collect the rainwater from the Beauport terminal, which had been running into the St. Lawrence River.

The project consisted of modifying two separate storm drain systems to intercept the existing systems and send their contaminated water to a treatment pond. All of this needed to be done while minimizing the impact on port activities.

Main features

  • Created a 90 m x 30 m x 7 m concrete treatment reservoir that can hold more than 10,000 m3 of water 
  • Built two pumping stations with four 100 HP pumps more than 6.5 metres below high tide
  • Installed 5 km of 450 mm and 550 mm HDPE pipes
  • Installed 5 purging and draining stations, one of which has a capacity of over 110,000 kg
  • Built two 25 kV electrical buildings and laid more than 400 metres of power line housing
  • Excavated more than 40,000 m3 of granular material

Repair of part of the Otis Street retaining wall – Phase III

Visitez le détail de ce projet
Privacy policy
  • Head office
    5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228
  • Montreal office
    1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989
  • Ontario office
    3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644
  • GIDC Mécatina
    Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526
Privacy policy

Contact