Repair of part of the Otis Street retaining wall – Phase III
Location
Matane, QC
Timeframe
2017
Description
This project consisted of repairing 126 linear metres of the retaining wall on Otis Street by concreting scoured sections under the wall using permanent formwork made of steel sheet pile. The concreting (more than 700 m³) was done sequentially to work with the tides.
Main features
- This project consisted of repairing 126 linear metres of the retaining wall on Otis Street by concreting scoured sections under the wall using permanent formwork made of steel sheet pile. The concreting (more than 700 m³) was done sequentially to work with the tides.







Design and installation of instrumentation, control, and automation systems