Description

Designed the electrical power distribution system, the motor controls and the automation system for the 10,000 tonne storage and ship loading facility, from the connection to the utility to the sensor level.

Supplied and installed all material necessary to construct an underground duct bank from the utility connection to the 1000kVA transformer, and from the transformer to the electrical room.

Supplied the electrical room (converted 55ft sea container), 1200A service entrance/panelboard, all motor control panels, and all control panels.

Provided construction site supervision for the electrical construction portion of the work above ground.

Assisted client to debug/commission equipment and are providing ongoing support of the facility

Supervision du chantier pour la partie des travaux de construction électrique en surface.

Aide apportée au client pour le déboggage et la mise en service des équipements et soutien continu offert à l’installation.

Main features

  • Designed the electrical power distribution system
  • Supplied and installed all material necessary
  • Supplied the electrical room
  • Provided construction site supervision

Repair of the Pointe-aux-Oies Swimming Pool

Visitez le détail de ce projet
Privacy policy
  • Head office
    5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228
  • Montreal office
    1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989
  • Ontario office
    3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644
  • GIDC Mécatina
    Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526
Privacy policy

Contact