Repair of the Pointe-aux-Oies Swimming Pool
Location
Montmagny, Québec
Timeframe
2019
Description
This project included the construction of the new concrete swimming pool and the expansion of the swimming pool at the Pointe-aux-Oies campsite. The project took place in 2019 and lasted 5 months.
Main features
- Formwork work on the swimming pool structure;
- Concrete work on the structure of the swimming pool;
- Construction and expansion of the mechanical room for the swimming pool and water games;
- Construction of a filtration / supply system for the swimming pool;
- Formwork for the slab of the water games;
- Concrete work for the slab of the water features.