Repair of the Pointe-aux-Oies Swimming Pool

Location

Montmagny, Québec

Timeframe

2019

Description

This project included the construction of the new concrete swimming pool and the expansion of the swimming pool at the Pointe-aux-Oies campsite. The project took place in 2019 and lasted 5 months.

Main features

  • Formwork work on the swimming pool structure;
  • Concrete work on the structure of the swimming pool;
  • Construction and expansion of the mechanical room for the swimming pool and water games;
  • Construction of a filtration / supply system for the swimming pool;
  • Formwork for the slab of the water games;
  • Concrete work for the slab of the water features.