Replacement of inflatable supers at Windsor Dam

Location

Windsor, Québec

Timeframe

2017

Description

The project consisted of work for the de-installation of the existing supers, handling and finally the installation of the new supers that were supplied by the client.

Main features

  • Increase 1: Decommissioning of existing fusegates. Cleaning and preparation for new installation. Installation of the new fusegate and commissioning and testing;
  • Increase 2: Dismantling of the existing fusegates. Cleaning and preparation for the new installation. Installation of the new fusegate and commissioning and testing;
  • Increase 3: Dismantling of the existing fusegates. Cleaning and preparation for the new installation. Installation of the new fusegate and commissioning and testing;
  • Fusegates 4-A and 4-B: Dismantling of the existing fusegates. Cleaning and preparation for the new installation. Installation of the new fusegate and commissioning and testing;
  • Installation of a work cofferdam;
  • Repair of concrete surfaces;
  • Formwork and concreting of new concrete supports for the new fusegates.

Increasing the electrical distribution capacity of the Anse au Foulon terminal

Visitez le détail de ce projet
Privacy policy
  • Head office
    5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228
  • Montreal office
    1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989
  • Ontario office
    3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644
  • GIDC Mécatina
    Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526
Privacy policy

Contact