Replacement of inflatable supers at Windsor Dam
Location
Windsor, Québec
Timeframe
2017
Description
The project consisted of work for the de-installation of the existing supers, handling and finally the installation of the new supers that were supplied by the client.
Main features
- Increase 1: Decommissioning of existing fusegates. Cleaning and preparation for new installation. Installation of the new fusegate and commissioning and testing;
- Increase 2: Dismantling of the existing fusegates. Cleaning and preparation for the new installation. Installation of the new fusegate and commissioning and testing;
- Increase 3: Dismantling of the existing fusegates. Cleaning and preparation for the new installation. Installation of the new fusegate and commissioning and testing;
- Fusegates 4-A and 4-B: Dismantling of the existing fusegates. Cleaning and preparation for the new installation. Installation of the new fusegate and commissioning and testing;
- Installation of a work cofferdam;
- Repair of concrete surfaces;
- Formwork and concreting of new concrete supports for the new fusegates.







Increasing the electrical distribution capacity of the Anse au Foulon terminal
Visitez le détail de ce projet
Head office
5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228Montreal office
1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989Ontario office
3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644GIDC Mécatina
Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526