Water treatment, Beauport – 25kV – 600 V Electrical Engineering
Location
Baie de Beauport, Québec, QC
Timeframe
4 months
Description
Power system studies, equipment specification and construction drawings.
Main features
- Massifs de conduits
- 25 kV cables and termination
- Low voltage power cables
- 1500 kVA pad mounted transformer (53F)
- 2000 A, 600V switchboard
- 600 V distribution panels
- Variable frequency drives
- Cable trays
- Grounding

Limoilou substation – Phase 2