Repair of the lock at the Ste-Anne-de-Bellevue
Location
Sainte-Anne-de-Bellevue, Québec
Timeframe
2019
Description
The project consisted of the rehabilitation of the upstream walls of the Sainte-Anne-de-Bellevue Canal, among other things: complete and partial demolitions and reconstructions of jetty walls upstream of the marina, the demolition and complete reconstruction of a concrete head and its wooden casing. The repairs consist of complete and partial demolitions of the walls of the old lock, the nautical markings of the central caisson and electrical and civil works to complete the work.
Main features
- Sidewalk reconstruction work, footbridge installation, sidewalk demolition, shuttering and metalwork, curing and heating;
- Repair of the anchor for the adjustment rod;
- Installation of joists and pumping of the dry dock of the lock, characterization and disposition;
- Dismantling of hydraulic components;
- Installation of hydraulic components;
- Pumping, dry-out and water control work;
- Installation of phase 2 access stairs;
- Replacement of the tensioners on doors 1 to 4;
- Repair of the guardrails of doors 1 to 4 and anchoring openings to the gratings, maintenance of the lower pivots of doors 1 to 4 and replacement of their sealing systems;
- Repair of joists.