Limoilou substation – Phase 2

Location

Quebec City, QC

Budget

-

Timeframe

2019

Description

Fabricated 42″ diameter pipes and a 42″ mitre joint for the Limoilou wastewater pumping station.

Fabricated and assembled stainless steel pipes and brackets.

Main features

  • Fabricated 42″ diameter pipes and a 42″ mitre joint for the Limoilou wastewater pumping station.
  • Fabricated and assembled stainless steel pipes and brackets.

Piping – Ste-Foy WTP

Visitez le détail de ce projet
Privacy policy
  • Head office
    5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228
  • Montreal office
    1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989
  • Ontario office
    3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644
  • GIDC Mécatina
    Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526
Privacy policy

Contact