Description
Construction of 50,000 sq. ft. warehouse, involving demolition, excavation, soil decontamination, concrete work, drain and aqueduct work, work on steel structures, paving, and electrical work. Deric Construction Inc. was fully responsible for this multidisciplinary project.
Main features
- Improved soil under the foundations using controlled modulus columns to reduce settling and ensure the soil had the necessary load-bearing capacity
- Excavated and managed contaminated materials
- Placed formwork, cages, and concrete in the foundations
- Built a steel structure and envelope
- Carried out electrical, ventilation, drain and aqueduct, and site development work, including paving
- Installed a scale and guardhouse
- Added a water meter room





















STMT – Bringing Building A up to standards
Visitez le détail de ce projet
Head office
5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228Montreal office
1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989Ontario office
3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644GIDC Mécatina
Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526