Upgrading of the lifting systems of the Québec-Lévis Crossing
Location
Quebec City, Québec
Timeframe
2019
Description
Construction of a building for hydraulic units. Demolition and construction of a steel structure and installation of hydraulic cylinders.
Main features
- Quebec and Lévis sites: Relocation of the existing shed and work on the service building, excavation, concrete work, formwork, reinforcement, cure, form stripping, backfill, building structure.
- Work for the access staircase of service buildings, roofing and interior cladding work, metal exterior cladding, ventilation opening, epoxy floor painting.
- Building mechanics work with ventilation.
- Electrical work, installation of new equipment, connection work, commissioning and heating of the dock.
- Stopping of the operations for the ferries: Demolition of existing structures, installation of metal structures, installation of jacks, commissioning and testing.







Replacement of inflatable supers at Windsor Dam
Visitez le détail de ce projet