Upgrade of the leachate treatment system
Location
Frampton, QC
Timeframe
2019
Description
For this project, Deric Construction was mandated to upgrade the leachate treatment system at the Nouvelle-Beauce waste collection and management centre.
Main features
- Installed control panels
- Installed 8 process and sludge pumps
- Built a walkway
- Installed piping for chemical products
- Installed a leachate heating system
- Installed a DAF system
- Installed an MBBR system
- Assembled and installed pipelines
- Installed building plumbing
- Carried out electrical work (connected power/control panels and equipment)
- Carried out ventilation work
- Carried out civil engineering work (blinding concrete, outdoor excavation, finishing of interior walls, installation of doors)







Piping – Ste-Foy WTP
Visitez le détail de ce projet
Head office
5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228Montreal office
1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989Ontario office
3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644GIDC Mécatina
Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526