Upgrade of the leachate treatment system

Location

Frampton, QC

Timeframe

2019

Description

For this project, Deric Construction was mandated to upgrade the leachate treatment system at the Nouvelle-Beauce waste collection and management centre.

Main features

  • Installed control panels
  • Installed 8 process and sludge pumps
  • Built a walkway
  • Installed piping for chemical products
  • Installed a leachate heating system
  • Installed a DAF system
  • Installed an MBBR system
  • Assembled and installed pipelines
  • Installed building plumbing
  • Carried out electrical work (connected power/control panels and equipment)
  • Carried out ventilation work
  • Carried out civil engineering work (blinding concrete, outdoor excavation, finishing of interior walls, installation of doors)

Piping – Ste-Foy WTP

Visitez le détail de ce projet
Privacy policy
  • Head office
    5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228
  • Montreal office
    1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989
  • Ontario office
    3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644
  • GIDC Mécatina
    Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526
Privacy policy

Contact