Upgrade of the leachate treatment system
Location
Frampton, QC
Timeframe
2019
Description
For this project, Deric Construction was mandated to upgrade the leachate treatment system at the Nouvelle-Beauce waste collection and management centre.
Main features
- Installed control panels
- Installed 8 process and sludge pumps
- Built a walkway
- Installed piping for chemical products
- Installed a leachate heating system
- Installed a DAF system
- Installed an MBBR system
- Assembled and installed pipelines
- Installed building plumbing
- Carried out electrical work (connected power/control panels and equipment)
- Carried out ventilation work
- Carried out civil engineering work (blinding concrete, outdoor excavation, finishing of interior walls, installation of doors)







Creation of a footbridge for the Parc des Saules