Upgrade of the leachate treatment system

Location

Frampton, QC

Timeframe

2019

Description

For this project, Deric Construction was mandated to upgrade the leachate treatment system at the Nouvelle-Beauce waste collection and management centre.

Main features

  • Installed control panels
  • Installed 8 process and sludge pumps
  • Built a walkway
  • Installed piping for chemical products
  • Installed a leachate heating system
  • Installed a DAF system
  • Installed an MBBR system
  • Assembled and installed pipelines
  • Installed building plumbing
  • Carried out electrical work (connected power/control panels and equipment)
  • Carried out ventilation work
  • Carried out civil engineering work (blinding concrete, outdoor excavation, finishing of interior walls, installation of doors)