Maison Lauberivière
Location
Quebec City, QC
Timeframe
2019
Description
Construction of a soldier pile wall. Installation of a soldier pile wall, up to 7.5 metres tall, to serve as formwork on four sides.
Main features
- Construction of a soldier pile wall for MK2 Excavation.
- Installation of a soldier pile wall, up to 7.5 metres tall, to serve as formwork on four sides.







Repair of the lock at the Ste-Anne-de-Bellevue
Visitez le détail de ce projet