Fréquence M

Location

Quebec City, QC

Timeframe

2017

Description

The project consisted of building a temporary soldier pile wall around the entire perimeter of the lot at an average depth of 5 metres to support the expansion of a building with two levels of underground parking.

Main features

  • The project consisted of building a temporary soldier pile wall around the entire perimeter of the lot at an average depth of 5 metres to support the expansion of a building with two levels of underground parking.

Repair of the lock at the Ste-Anne-de-Bellevue

Visitez le détail de ce projet
Privacy policy