Creation of a footbridge for the Parc des Saules
Location
Quebec City, QC
Timeframe
2020
Description
Creation of the steel structure for the Parc des Saules project. The structure was designed in weathering steel.
Main features
- Fabricated and assembled ten 17 m joists
- Fabricated and assembled hand- and guardrails
- Fabricated and assembled support beams and steel decking











Résidence Margo – Soldier pile wall
Visitez le détail de ce projet
Head office
5145, rue Rideau Québec, QC G2E 5H5 T 418 781-2228Montreal office
1100 Montée Masson Laval, QC, H7C 0J4 T 514 685-8989Ontario office
3-4055 Harvester Road Burlington, ON L7L 5Z7 T 905-631-9644GIDC Mécatina
Navco Nord 6, Rte Mécatina C. P. 156 La Tabatière, QC G0G 1T0 T 418 773-2659 | F 418 773-2526