Bringing the Les Érables reservoir up to standards

Location

Trois-Rivière, Québec

Timeframe

2018

Description

During this project, Deric Construction was mandated to bring the Les Érables water treatment plant up to standards, construct buildings, and connect wells to the new drinking water treatment system. Construction Deric also demolished and rebuilt the reservoir.

Main features

  • Demolished and rebuilt the reservoir
  • Built the Les Érables building
  • Laid the foundations of the St-Malo building
  • Modified the St-Malo building
  • Built the structure
  • Carried out building mechanic, electrical, and architectural work
  • Connected and commissioned the new drinking water conduit
  • Built chemical storage and dosing facilities
  • Installed the new tanks
  • Installed the Les Érables generator (delivery, excavation, connection, testing, and start-up)
  • Installed the new distribution piping in the building’s basement
  • Worked on the distribution pumps
  • Constructed the new treatment building
  • Installed the new distribution pumps