Repairs to the anchors of docks 105 and 106

Location

Quebec City, QC

Timeframe

2015

Description

This project involved refurbishing the anchors of docks 105 and 106 and repairing a mooring bollard at Anse au Foulon. Work involved demolishing existing niches, then drilling and tensioning 44 anchor points to restore capacity to the wharf.

Main features

  • This project involved refurbishing the anchors of docks 105 and 106 and repairing a mooring bollard at Anse au Foulon.
  • Work involved demolishing existing niches, then drilling and tensioning 44 anchor points to restore capacity to the wharf.

Water treatment, Beauport – 25kV – 600 V Electrical Engineering