Repairs to the anchors of docks 105 and 106
Location
Quebec City, QC
Timeframe
2015
Description
This project involved refurbishing the anchors of docks 105 and 106 and repairing a mooring bollard at Anse au Foulon. Work involved demolishing existing niches, then drilling and tensioning 44 anchor points to restore capacity to the wharf.
Main features
- This project involved refurbishing the anchors of docks 105 and 106 and repairing a mooring bollard at Anse au Foulon.
- Work involved demolishing existing niches, then drilling and tensioning 44 anchor points to restore capacity to the wharf.







Water treatment, Beauport – 25kV – 600 V Electrical Engineering