Potable and waste water system rehabilitation

Client and Location: Town of Magdalena Island. Magdalena Island, QC

Project Value: 1.9 M$

Project Schedule: September 2017 to May 2018

Project description: Rehabilitation of Magdalena Island potable and waste water systems.

Works performed:

  • Change all conduits and instrumentation of 18 wells between well pump discharge and feed conduits to potable water distribution system;
  • Change all waste water pumps including conduits replacement when needed;
  • Change all power distribution to potable and waste water pumps;
  • Change all control distribution system to potable water instrumentation (flow and pressure transmitters).