Anse au Foulon 25kV Substation

Client and Location: Port of Quebec. Quebec City, QC

Project Value: 1.4 M$

Project Schedule: October 2014 to September 2015

Project description: Increase by 1,5 MW the power distribution capabilities of Port of Quebec’s Anse au Foulon terminal to support new wood pellet storage and ship loading equipment and to allow implementation of future port services.

Works performed:

  • Construction of two new 25kV/600V substations of 2.5 MVA including underground cabling for both power and telecommunication;
  • Install new aerial and underground high voltage lines and their connection to Hydro Quebec network;

Perform all studies required by Hydro Quebec (harmonic, etc.) and arc flash analysis and training.